Malawi Infrastructure
- 48 core ADSS Overhead Cable, on our own poles
- 2 cores lit with 10G installed capacity, scalable to 1000G with SDH card replacement per pair, or lighting up more cores.
- Cross Connection with ZESCO on Zambia side and TTCL/NICTBB on Tanzania side